Tracer Lane Solar Project - 0 Cambridge St./Concord Turnpike

Public Hearing
0 Cambridge/ Concord Turnpike

The Lexington Planning Board will hold a virtual public hearing on Wednesday, December 7, 2022, at 6:00 p.m. on the application of Tracer Lane II Realty LLC for approval of a major site plan review under §135-6.11 and 9.5 of the Zoning Bylaw for a solar energy system.  The property is located at 0 Cambridge/Concord Turnpike, Map 19, Lots 1A in the CM Zoning District. The Applicant is proposing to install a ±1.0- megawatt (MW) ground-mounted solar energy system, with emergency and maintenance access from Sherbourne Place in Waltham.

Application materials may be viewed online at by clicking on the "files" tab: https://lexingtonma.viewpointcloud.com/records/67918

Access the virtual meeting may be found online at https://www.lexingtonma.gov/377/Access-Virtual-Meetings